Build time and transport time are different stages.
A boat or manufacturing project may include development, procurement, production, inspection, packing and onward transport.
The programme depends on the selected configuration, quantity, production scope and shipping arrangements. Any proposed timing should identify the stage it covers and the assumptions behind it. A general website estimate does not establish the dispatch or arrival date for an order.
Provide dimensions and a destination.
The transport method must suit the actual product and the receiving location.
| Information | What to establish |
|---|---|
| Product configuration | Model, quantity, overall dimensions and relevant installed equipment. |
| Transport dimensions | Packed length, width, height and weight, including cradle or support where applicable. |
| Packing method | Protection, restraints, supports and any equipment removed or packed separately. |
| Delivery point | Destination country, port or address, receiving access and unloading arrangements. |
| Responsibilities | Who arranges transport, insurance, export/import formalities and destination handling. |
Connect packing with the handover record.
The packing plan should describe the configuration being moved and the items accompanying it.
Complete the agreed checks
Review the inspection and acceptance requirements specified for the order before release.
Record the supplied package
Identify the boat or tooling reference, accompanying equipment and loose items. Keep the packing record with the shipment documents.
Confirm the movement
Agree the carrier or forwarder arrangements, transport method and contact details for the receiving party.
Prepare destination handling
Review access, unloading equipment and any further local preparation or commissioning included in the purchase.
Define the cost responsibilities in the order.
Freight charges vary with size, weight, destination, method and the services included.
The quotation or supply agreement should identify which charges are included and which are for the purchaser or consignee. Customs duties, taxes and destination fees remain the purchaser’s responsibility unless otherwise agreed in writing.
Carrier schedules, port operations, customs and other external conditions can affect transit. Discuss changes with the team or the transport provider using the actual shipment reference.
Keep useful evidence at delivery.
Check the shipment against the packing information and record relevant observations with clear photographs.
If damage, a missing item or a documentation issue is observed, notify the appropriate carrier and supply contact promptly in accordance with the shipment and order arrangements. Retain packaging and delivery records while the matter is reviewed.
For delivery planning, email [email protected] with the model or project reference and the intended destination.